Engineered Storage for the Next Phase of Produced Water Management in the Delaware

How disposal permitting, growing water volumes, and interconnected gathering systems are changing what's required of produced water storage infrastructure

For much of the Permian Basin's development, produced water systems were built around a straightforward objective: move water efficiently from the wellhead to disposal or recycling.

The Delaware Basin now operates under a different set of conditions. As water management systems become more interconnected, the role expected of storage has expanded beyond what much of the existing infrastructure was designed to handle. 

Produced Water Tanks - 2,000,000 bbl Total Project Storage

Access the White Paper


What You'll Learn

  • Why water-to-oil ratios in the Delaware Basin are putting new pressure on storage infrastructure
  • How tightening disposal permitting since June 2025 is widening the gap between installed and operationally available capacity
  • Where the Concept Tanks fits in the produced water network
  • Four technical and economic criteria for evaluating storage as infrastructure: volume, containment, redeployability, and lifecycle economics
  • How modular, redeployable tank design changes the cost and permitting picture